26th September 2024
Thursday 26th September 2024:
An amended timetable will be in operation, in respect of the following:
- Emergency engineering works at Aylesbury (09.35 to 15.35).
- (Flood-damaged signal cable repairs).
During the above period, emergency engineering works will be taking place at Aylesbury. No trains will operate on the routes Amersham - Aylesbury Vale Parkway and Princes Risborough - Aylesbury.
Rail replacement buses will operate as follows, connecting with London Underground Metropolitan Line trains to/from Baker Street at Amersham and with Chiltern Railways trains to/from Marylebone at Princes Risborough:
- Amersham - Great Missenden - Wendover - Stoke Mandeville - Aylesbury - Aylesbury Vale Parkway.
- Princes Risborough - Little Kimble - Aylesbury.
- Princes Risborough - Monks Risborough.
Finalised timetables are uploaded into online journey planners 9 weeks before the date of operation. Please check your journey in the planner at the following link: https://buy.chilternrailways.co.uk/. Any journey checked outside of this timescale may be subject to change; please double-check how these amendments are due to affect your travel plans. For some engineering works and special events at Wembley Stadium, timetables may be released closer to the date of operation.