2nd September 2024

02/09/2024

Monday 2nd September 2024:

An amended timetable will be in operation, in respect of the following:

  • Planned engineering works (late night).
  • (Routine maintenance between Princes Risborough/Aylesbury).

The railway is closed between Princes Risborough and Aylesbury after midnight. During this period, rail replacement buses will operate as follows, connecting with trains from Marylebone at Princes Risborough:

  • Princes Risborough - Monks Risborough - Little Kimble - Aylesbury.

Finalised timetables are uploaded into online journey planners 9 weeks before the date of operation. Please check your journey in the planner at the following link: https://buy.chilternrailways.co.uk/. Any journey checked outside of this timescale may be subject to change; please double-check how these amendments are due to affect your travel plans. For some engineering works and special events at Wembley Stadium, timetables may be released closer to the date of operation.

Last updated: 21/06/24 - 11:02