31st August 2025

31/08/2025

Sunday 31st August 2025:

An amended timetable will be in operation, in respect of the following:

  • Planned engineering works (early morning).
  • (Track works at Marylebone).
  • Wembley Stadium event - Cold Play.

The railway is closed between Marylebone and Wembley Stadium/Harrow on the Hill until 10.35. During this period, trains will operate north of West Ruislip and Amersham. Connecting London Underground Central Line services should be used between central London and West Ruislip, and Metropolitan Line services should be used between Baker Street and Amersham.

In respect of the Wembley Stadium event, an enhanced timetable will be in operation during the afternoon and evening, with additional Wembley Stadium stops in trains, and also some additional trains.

A reduced service of 1 train per hour will operate between Marylebone and Aylesbury Vale Parkway during the afternoon and evening, until 20.00. After 20.00, no Chiltern Railways trains will operate on the Marylebone/Aylesbury Vale Parkway route. During this period, rail replacement buses will operate as follows, connecting with London Underground Metropolitan Line services to/from Baker Street at Amersham:

  • Amersham - Great Missenden - Wendover - Stoke Mandeville - Aylesbury - Aylesbury Vale Parkway.

Finalised timetables are uploaded into online journey planners 9 weeks before the date of operation. Please check your journey in the planner at the following link: https://buy.chilternrailways.co.uk/. Any journey checked outside of this timescale may be subject to change; please double-check how these amendments are due to affect your travel plans. For some engineering works and special events at Wembley Stadium, timetables may be released closer to the date of operation.

Last updated: 28/03/25 - 12:50