28th October 2024

28/10/2024

Monday 28th October 2024:

An amended timetable will be in operation, in respect of the following:

  • Planned engineering works.
  • (Drainage works between Langley Green and Stourbridge Junction and level crossing works at Cradley Heath).

The railway is closed between Langley Green and Stourbridge Junction for 5 days between 27th and 31st October inclusive. During this period, no Chiltern Railways services will operate between Stourbridge Junction and stations to Birmingham Moor Street. Local journeys on this route can be undertaken using West Midlands Trains' rail replacement bus services - please refer to the following link:

Snow Hill Lines: October Engineering Works | West Midlands Railway

Additionally, there are some further changes affecting our timetable due to operational constraints, as follows:

  • 07.20 Birmingham Moor Street - Leamington Spa is CANCELLED.
  • 08.06 Leamington Spa - Birmingham Moor Street is CANCELLED.
  • 09.19 Birmingham Moor Street - Leamington Spa is CANCELLED.
  • 10.03 Leamington Spa - Birmingham Moor Street is CANCELLED.
  • 11.15 Birmingham Moor Street - Leamington Spa is CANCELLED.
  • 12.03 Leamington Spa - Birmingham Moor Street is CANCELLED.
  • 13.15 Birmingham Moor Street - Leamington Spa is CANCELLED.
  • 14.02 Leamington Spa - Birmingham Snow Hill is CANCELLED.
  • 15.11 Birmingham Snow Hill - Leamington Spa is CANCELLED.
  • 16.06 Leamington Spa - Birmingham Moor Street is CANCELLED.
  • 17.20 Birmingham Moor Street - Leamington Spa is CANCELLED.
  • 18.07 Leamington Spa - Birmingham Moor Street is CANCELLED.

Before 09.30 and after 15.30, Hatton and Lapworth stops are added to other services. Between 09.30 and 15.30, rail replacement buses will operate as follows, for local journeys to/from Hatton and Lapworth:

  • Warwick Parkway - Hatton - Lapworth - Dorridge.

Finalised timetables are uploaded into online journey planners 9 weeks before the date of operation. Please check your journey in the planner at the following link: https://buy.chilternrailways.co.uk/. Any journey checked outside of this timescale may be subject to change; please double-check how these amendments are due to affect your travel plans. For some engineering works and special events at Wembley Stadium, timetables may be released closer to the date of operation.

Last updated: 24/10/24 - 01:10